SFC was solicited by the Laconia Fire Department to provide Fire Protection Engineering Services throughout multiple phases of their construction process.

SFC worked closely with both John Carter Sprinkler and Warrestreet Architects throughout the construction of the Laconia Fire Department.

SFC provided Warrenstreet Architects with services for the preparation of the Above Ground Storage Tank permit application as required by NH DES related to the standby generator being installed at the site. SFC provided the engineering oversite needed to complete the application, and represented Laconia Fire Department throughout the entire process.

Carter Sprinkler put together fire protection sprinkler plans, in which SFC reviewed to ensure they were suitable for the construction project.